01
Lift-out
Bring the boat ashore for planned storage or work. The yard reviews lifting points, weight and dimensions before agreeing the operation.
What the quote covers
Illustrative scope: lift from water to prepared hardstanding. Supports, transport and time ashore are separate parts of the quote.
Planning envelope
Demo planning envelope: LOA 11 m, beam 3.8 m, displacement 8 tonnes. These are not operational limits or acceptance.
Before the operation
Operator approval, vessel details, safe lifting plan and suitable supports are required before a date is confirmed.
What to include
Send dimensions, approximate displacement, intended work and preferred dates. The operator sets the actual notice period.
Prepare a yard request